Jump to content

NSD Lower Neck Ring Segments (For 200mm bed) 1.0.0

   (0 reviews)

4 Screenshots

About This File

Lower ring segments that incorporate the strut knuckle. x4 of N101 and x4 N102 required to complete the ring. The N102 includes a feature to fix in an M6 x 50 nut and bolt to locate the neck assembly to the shoulders at a later date. I glued each segment together one after the other using superglue and clamps, then filled on both the underside and the joints using U-pol Fantastic two part body filler. An alternative to wooden routed rings if, like me, your router (and routing skills!) are a bit dodgy.

  • Like 1

User Feedback

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest

  • This will not be shown to other users.
  • Add a review...

    ×   Pasted as rich text.   Restore formatting

      Only 75 emoji are allowed.

    ×   Your link has been automatically embedded.   Display as a link instead

    ×   Your previous content has been restored.   Clear editor

    ×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...

Important Information

By viewing this site you accept our terms, conditions and privacy policies.